Hitachi BZ-1 Bedienungsanleitung Seite 110

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 122
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 109
110
Message Description
The internal temperature is rising.
Please turn the power off, and allow the projector to cool
down at least 20 minutes. After having conrmed the
following items, please turn the power ON again.
• Is there blockage of the air passage aperture?
• Is the air lter dirty?
• Does the peripheral temperature exceed 35°C?
• Is the projector used at an altitude of about 1600 m or
higher? If the projector is used at an altitude of about 1600 m
or higher, set FAN SPEED of the SERVICE item in the OPTION
menu to HIGH
(
61).
A note of precaution when cleaning the air lter.
Please immediately turn the power off, and clean or change
the air lter referring to the “Cleaning and replacing the
air lter” section of this manual. After you have cleaned or
changed the air lter, please be sure to reset the lter timer
(
58, 104).
The button operation is not available.
Troubleshooting
Related messages (continued)
Seitenansicht 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 121 122

Kommentare zu diesen Handbüchern

Keine Kommentare